The 3GEN Approach
One team, from first brief to signed handover.
No subcontractors, no handoffs between agencies. The same in-house team designs, engineers, fabricates, ships and installs your stand — every stage controlled under one roof in Valandovo, with the Middle East hub covering the Gulf.
How a build runs
Six steps, one accountable partner.
The same in-house team carries the stand from the design screen to the signed handover on the fairground floor. Nothing is subcontracted and nothing ships before it has been assembled once in the factory.
Briefing & Intake
Intake ≤ 4 h · senior estimator + project engineer
Your show manual, hall plot and structural height limits reach our senior estimator and project engineer. Commercials and scope are scoped before any design work starts — no surprises later.
Concept Design
3D spatial concept + itemized BoQ ≤ 24 h
A photorealistic 3D concept of your stand lands in your inbox with an itemized Bill of Quantities. The budget is indicative until that BoQ is signed — then the price is fixed.
Engineering & Manufacturing
Own 3,500 m² floor · 800 m² / month cap
Joinery, metalwork and finishes are produced on our own CNC floor in Valandovo, then dry-assembled end to end and signed off before a single panel is packed. The monthly cap exists so the dry-run is never skipped.
Logistics & Transit
EU move-in 36–72 h · GCC 72–96 h
Transport is planned backwards from each venue’s build-up window: TIR convoy with ATA Carnet customs handling for Europe, sea freight to Jebel Ali and hub trucking for the Gulf.
On-Site Installation
Same crew that built it · supervised on fairground
The crew that fabricated and dry-ran your stand re-erects it on the fairground floor under venue rules — wall heights, rigging loads, fire certs — all handled by us.
Handover & Storage
Signed checklist · dismantling · Valandovo storage
Handover happens against a written checklist. After the show we dismantle, and the structure can go back into Valandovo storage — ready for the next exhibition cycle at a fraction of the cost.
Every stand is built in our own workshop — and the workshop has a calendar.
We cap simultaneous booth production at 800 m² per month so every build gets a full factory dry-run before it ships. Browse the production cycles below and enquire early for peak seasons.
3,500 m² facility • 4 CNC production bays • 800 m² simultaneous booth production / month
HQ: Valandovo, North Macedonia | HUB: Dubai, UAE
Q1 — High Occupancy
Builds in this cycle are typically commissioned for Messe Frankfurt, DWTC Dubai, MWC Barcelona.
Single or double deck — steel mezzanine builds start at 60 m² ground.
- 1Architectural Intake — within 4hEstimator and engineer review your show manual and hall plot (Valandovo business hours)
- 23D Concept & BoQ — within 24hItemized Bill of Quantities, renders, and a fixed turnkey proposal by email
- 3Production ReservationFactory dry-run slot reserved at the Valandovo workshop
- 4TIR Convoy & Move-InDirect hall transport — EU move-in 48–72h, Dubai/Riyadh 72–96h
European Craftsmanship. Middle East Agility.
Strategically located to support exhibitions across Germany, France, Spain, the DACH region, and the GCC.
Valandovo, Europe
North Macedonia • Direct EU Transit Corridor
Our central manufacturing heartland. A 3,500 m² workshop where joinery, metalwork and finishes are built entirely in-house — every stand is dry-fitted on site before it ships.
Dubai, UAE
United Arab Emirates • DWTC & Expo City
Serving the fast-moving GCC market. Our own project directors and installation crews cover Dubai World Trade Centre, Expo City Dubai, and Riyadh Front — with builds shipped by sea freight to Jebel Ali and trucked from the hub.
Certified Turnkey Contractor Across Major International Exhibition Venues:
Direct show-management badging & fast-track hall access