Next-Gen Financial Architecture
Bespoke exhibition architecture engineered for Apex Global Financial Technologies at Dubai World Trade Centre (Za'abeel Hall) (Dubai, UAE).

The Challenge
Navigating complex hall regulations, static structural requirements, and tight event timelines.
The client wanted a double-deck flagship with a private VIP level, but the move-in window at DWTC is the longest transit of any show on the calendar and two-tier builds trigger venue structural review.
- Structural approval required before hall access
- 72–96 h move-in window after sea-freight arrival
- Upper-level sightlines over the surrounding pavilions
The Solution & Approach
Primary steel and joinery were fabricated in Valandovo, shipped by sea to Jebel Ali, and completed by the Dubai hub crew inside the venue window with approvals filed in parallel.
Registered structural review
The mezzanine calculation package was submitted and approved under Dubai venue safety codes ahead of move-in.
Curved LED media column
A 360° P1.9 cylindrical video tower anchors the ground floor and syncs with booth audio for product moments.
Amphitheatre seating
An 80-seat stepped presentation area with flush recessed power keeps the demo audience inside the stand footprint.
Full Turnkey Deliverables Included in This Build
Precision Turnkey Execution
How 3GEN managed design, in-house joinery manufacturing, cross-border logistics, and on-site handover.
Design & Structural Engineering
Double-deck concept, static load diagrams, and the venue structural submission package.
- Venue approval filing
- 3D renders
- Fixed BoQ
Factory Production & Dry-Run
Steel frame and walnut joinery fabricated and 100% dry-fitted before crating for sea freight.
- 100% dry-fit
- Sea-ready crating
Freight & Hub Transfer
Container freight to Jebel Ali port with Dubai hub trucking to DWTC, coordinated against the show calendar.
- Port clearance
- Hub crew staging
On-Site Build & Handover
Two-tier assembly inside the extended move-in window, LED commissioning, and handover.
- Mezzanine install
- Media sync test
- Signed handover
Architectural Gallery
Planning a Similar Project?
Connect directly with our senior estimators for a preliminary 3D concept, venue static assessment, and itemized bill of quantities for your upcoming trade show in Europe or the GCC.


